Virtually Maintenance Free—Eliminates the Need for Elaborate Water Control
& Handling |
 |
No
electric Wiring or Mechanical Parts Required |
 |
No
Monitoring Required |
 |
Proven
Effective 24/7 Spill & Leak Protection |
 |
Provides Fire Suppression (Fire Quenching Stone Surface Layer—Reduces Fire
Spread) |
 |
Significantly Reduces Liability Associated with Oil Spills |
 |
Easy to Repair; Modify & Expand |
 |
Polymer Half-Life is Greater than 200 Years under an Oxygen-Starved Environment
|
 |
Engineered Hydraulic Containment System |
 |
Shallow
Excavation Depth (Generally Less Than 24”)
|
 |
SorbWeb™ Plus Geocomposite Liner Components are easy to install & replace |
 |
Life
expectancy exceeds the Lifetime of the Transformer |
 |
SorbWeb™ Plus Installation does not require shutdown of Station Electrical
Equipment
|
 |
SorbWeb™ Plus Liner System is Modular in Design & easy to install,
disassemble, or reconfigure
|
 |
A unique aspect of the SorbWeb™ Plus System is its passive ability to be
effective Oil Containment Method
|
 |
SorbWeb™ Plus System use a modular liner design that offers extreme design
flexibility & effectiveness. Liner
support containment design can employ poured concrete, berm, or fabricated
support walls
|
 |
SorbWeb™ Plus Systems can be placed around individual electrical components or
other larger oil-filled equipment
|
 |
SorbWeb™ Plus Systems can be installed over or under cable trays & other
obstructions within the containment area
|
 |
SorbWeb™ Plus System is a long-term semi-permanent installation fastened to a
support wall (berm or fabricated wall). SorbWeb™ Plus Systems can easily be
uninstalled by removing the fire-quenching stone (vacuum truck) & individual
liner layers. Excavated SorbWeb™
Plus Systems can be re-installed at locations with the same design criteria
|
 |
The SorbWeb™ Plus System excavation depth is generally less than 24” maximum
& may be considerably less, depending on the size of the containment
footprint determined for a specific site
|
 |
Electricians are not required for installation
|
 |
A forklift is required for unloading & placing material
|